7.5.2012 15:51:00 | Author/Source www.seenews.com
The first phase of a Croatia–Slovenia interconnector with a capacity of 13.7 million cubic meters per day is planned to become operational in 2017, a report of the European Network of Transmission System Operators for Gas (ENTSOG) indicated.
The planned route of the gas link runs from Bosiljevo through Karlovac, Lucko and Zabok on Croatian territory to Rogatec in Slovenia, the report posted on the website of ENTSOG last month indicated.
|